SJFoam.com
Our Equipment
"Foamie" 16ft Box truck
Graco E30 Reactor
Graco GH833 Hydraulic sprayer for roofing topcoats or thermal barriers
300' of heated hosed with 3 Graco Fusion AP Spray Guns (assorted round mix chambers from 01-04 and pour and spatter tips)
Drum racks for 2 sets of Foam
Our Recent Foam Project
Roof construction of Gypsum/cement panels supported by steel members Areas of compromised panels have been replace with pressure treated lumber. Ceiling is subject to flash steam from wet processing equipment and process exhaust fans result in a building draft of up to 1/2 inH20
All unnecessary plumbing and electrical is removed. All remaining pipes and conduits are masked. After powerwashing, rusted steel work is addressed and ceiling is spray with ~2" of Closed cell FoamLok. Focus has been sealing the cracks between panels and the panel to steel transition points as opposed to spraying in a single direction pattern.
Varying Surface finish based solely on spray technique. (Same settings on Reactor)
Sanded samples of foam showing cell structure
Foamed section of ceiling with encapsulated roof purlin (still to be coated with thermal barrier)